Salford runs selective licensing and Eccles is inside it. The council page for the designation says "This scheme commenced on 1 September 2022 and will last for five years. The scheme will end on 1 September 2027", lists 95 named streets, and notes that "all properties on a boundary (ie both side of the street) are included within the designation". Salford names two selective licensing designations in the city, this one and Broughton, Kersal and Broughton Park. The council's own how licensing works page does not make an EICR a stated licence condition; it says a licence holder can upload "safety certificates (gas, fire, electrical and portable appliance)" to the licence (Salford City Council, selective licensing in Eccles, Barton and Winton, read 16 September 2026).
The designation covers those 95 streets. Outside them this selective licensing scheme does not apply, and mandatory HMO licensing may still apply. The duty that covers the rest of the town is national: the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require the installation inspected and tested by a qualified person at least every five years, a copy of the report to the existing tenant within 28 days of the test and to a new tenant before they move in, remedial or further investigative work within 28 days, or sooner if the report requires it, and allow a financial penalty of up to 40,000 pounds for a breach. The 2025 amendment extended the regime to the social rented sector (gov.uk guidance on electrical safety standards in the private and social rented sectors, read 16 September 2026).
Salford's conservation areas page names 16 areas, including Barton-upon-Irwell, Ellesmere Park and Monton Green. That bears on outside work rather than on wiring. The Planning Portal sets the charger limits: 0.2 cubic metres for a wall mounted outlet and its casing, nothing within the curtilage of a listed building, an upstand no higher than 1.6 metres in the curtilage of a dwellinghouse and one per parking space, and off street parking. Permitted development rights can be removed by an article 4 direction in a conservation area or designated heritage site (Planning Portal, electric vehicle charging permitted development, read 16 September 2026).
The line that belongs on the certificate page is the check: look the address up on the council street list, look for any article 4 direction, then say what the job needs. A landlord on one of the 95 streets then knows exactly where they stand.