Neath Port Talbot Council sets its crossing conditions in numbers. A driveway must "be more than 4.8 metres long, from your house to where your drive meets the pavement", "be more than 2.6 metres wide at all points (3.6 metres for disabled access)", "allow you to drive into the property in one movement. The driveway should be at 90 degrees to the road" and "be at least 10 metres away from main junctions".
On who does the work the council is open: "You can hire your own contractor. We will check the work meets the agreed standards when it is complete." It adds that "As part of the application, we will check if you need planning permission for the proposed access", and that a tenant must get the landlord's permission before applying.
Neath is in Wales, so the front garden rule is the Welsh Government's rather than the English Planning Portal's. The Welsh Government states: "If you are intending to lay or replace a hard surface to the front of your house you must use permeable or porous materials; alternatively surface water run-off from an impermeable hard surface, such as concrete, must be directed to a permeable or porous surface to the front of your home", and "You can replace or repair a small area of up to 5 square metres of existing hardsurfacing without using permeable or porous materials".
The Welsh Government adds that permitted development rights may have been removed by the local planning authority or by an article 4 direction, which it says is "most common in conservation areas", and that a listed building may need listed building consent.
We would explain how you check the conservation boundary, any article 4 direction, the council's crossing measurements and the proposed work before confirming whether permission is needed.